FACTS:

  • The well was completed on May 3, 2012.
  • A reliable flow of 15 gallons per minute or 20,000 gallons per day was established.
  • Bud Mulcahy met with Dr. Joyce Laboso, MP of the Kenya National Assembly, and the district engineer, establishing a working relationship for the next phase of water storage and distribution. The plans call for bringing in electricity, con-structing an elevataed water storage tank and pipe lines to several water distribution points.
  • An elevated water storage tower was completed on April 20, 2013.