FACTS:
- The well was completed on May 3, 2012.
- A reliable flow of 15 gallons per minute or 20,000 gallons per day was established.
- Bud Mulcahy met with Dr. Joyce Laboso, MP of the Kenya National Assembly, and the district engineer, establishing a working relationship for the next phase of water storage and distribution. The plans call for bringing in electricity, con-structing an elevataed water storage tank and pipe lines to several water distribution points.
- An elevated water storage tower was completed on April 20, 2013.